Timberframing for Vacation

I took my vacation this year in Maine learning to timberframe at the Fox Maple Timberframing School. It was great.

Fox Maple Office

Here's the main office at Fox Maple. This was a combination of two class projects, a two-bent saltbox, and a three-bent high-posted cape built in the Fall 1994 & Spring 1996 workshops.

Timberframe 01

I attended both the Introductory and Advanced workshops in Spring of 2010. After four days of classroom instruction, we were set loose to start making shavings. In answer to the question we all asked in high school - "what will I ever need this trig stuff for?", this is it!

Our introductory class's project was a 22'x32' Hammerbeam Cape with three bents made from white pine with oak braces. Here, I'm cutting the fork portion of a tongue-and-fork rafter joint.

 

Timberframe 03 Timberframe 05 Timberframe 06

Our group of 20 students spent the Friday and half of Saturday cutting the timbers for the frame. On Saturday afternoon, we began ther raising. Luckily, the school has a rough terrain forklift for all the heavy moving. While I enjoy working with "old-fashioned" chisels and planes, some things are better left to technology.

Here is a Wedged Half-Dovetail Through Tenon on the tie-beam and post on the first bent being assembled. The tie-beam is the tension member between the two vertical posts in the bent. Its purpose is to keep the posts from spreading outward at the top due to the roof load.

 

Timberframe 07 Timberframe 08 Timberframe 09

The haunch on the tie beam into the post supports the shear load from the second floor across the full width of the post instead of just the 2" wide tenon. In addition, the tenon has half of a dovetail on the bottom edge. This is what makes the joint resist the pulling forces. Once the half dovetail tenon is slipped into the post and is pushed down into position, it is locked into place with an oak wedge.

 

Timberframe 10 Timberframe 11 Timberframe 12

This is an English Tying Joint that unites the vertical post, horizontal wall plate, and inclined rafter into one joint. The joinery at the top of the post isn't too bad, but it gets rather complicated when chiseling out the mating geometry on the bottom of the rafter!

 

Timberframe 13 Timberframe 14

The collar tie to rafter Angled Tenon joint in this photo needed a little last minute paring to mate cleanly. Up until this point, none of these joints had been previously assembled. All cutting had been done based off of measurements only. The rafter is upside down in this photo, but you can see the roof purlin Housed Dovetail joints.

 

Timberframe 15 Timberframe 16 Timberframe 17

Groups of students making last minute adjustments to various joints in preparation to assembling and raising the first bent.

 

Timberframe 19 Timberframe 22

The English Tying Joints handle tension and compression loads very well, but they do not have any strength in bending. To keep the joints together for the raising of the bent, reinforcements are clamped across the joint.

 

Timberframe 23 Timberframe 26 Timberframe 25

Once the bent has been hoisted (think about doing this by hand!), bracing is installed to hold the bent vertical, and the joint reinforcements are removed.

 

Timberframe 27 Timberframe 33

With the first bent up and out of the way, the parts for the second bent are assembled in a repeat of the previous process.

 

Timberframe 35 Timberframe 38

Here the second bent has been hoisted and is being braced into place relative to the first bent.

 

Timberframe 40 Timberframe 41

The top plates are then placed between the two bents, and then the roof purlins are dropped into the dovetails to lock the two bents together.

 

Timberframe 42 Timberframe 43

The third bent, which gives the Hammerbeam Cape its name, is the Hammerbeam Truss. In a regular truss like the first and second trusses, the vertical roof loads cause the rafters to want to "flatten out", which requires the addition of the tie-beam to prevent the vertical posts from bending outward and the truss collapsing. The various timbers in this truss direct the roof loads into a vertical direction down the vertical posts instead of into the horizontal spreading loads.

 

Timberframe 47 Timberframe 50

The sun has set, but the party is just getting started. The third bent is now assembled and ready for raising. That's me waving after "topping out" the structure.

 

Timberframe 53 Timberframe 54

Lisa and I came back the next day to get clear photos in daylight. The party went on till well after midnight, but there wasn't sufficient light for good photos. Unfortunatly, this meant the rest of the team is left out of these shots. A this point, the framejoints are usually pegged and the building would stand on its own. Since this builting will be taken apart and reassembled at another site, none of the joints have been pegged and the ropes and straps are temporarily holding things together.

 

Timberframe 55 Timberframe 57

The beginning of the second week, the Advanced course. This course really tested my trig skills. Truth be told, only two people in the class had a really good understanding of the trig needed for this week, myself and one high school kid attending the class! All I can say is what a lucky kid to be able to partake in something like this.

 

Timberframe 58 Timberframe 60

Again, after four days of instruction, we were turned loose on the timbers. Our project for this week was a half-octagon addition for the front of the previous weeks Cape.

Here I'm starting on the King Post - the most important part in this addiiton as it ties all of the rafters together.

 

Timberframe 62 Timberframe 61

We're getting ready to start the raising on Saturday afternoon, and I'm running around putting the finishing touches on the last few timbers. I'm smoothing off the peak on the ridge beam after cutting the tenons and slicing off the top at 45° on both sides.

You can't see it, but I'm using one of the nicest planes I have ever touched in my life to smooth the acorn finial on the King Post. I designed the acorn in AutoCAD on the laptop Friday night and calculated a series of kerf cuts on each side of the octagon to for the acorn. On Saturday, no one could see how this would work, but everyone said go for it,so I did. After 80 saw cuts, everyone was still skeptical, but I soon started knocking off the waste between the cuts and the acorn begain appearing much to everyone's relief.

 

Timberframe 63 Timberframe 66 Timberframe 67

Assembling this roof section and strapping it together to hoist it (remember we can't install the pegs which usually hold everything together) was a little bit of a problem given the shortage of straps and come-a-longs. I eventually devised a solution using what little we had in the way of rigging and we were able to proceed with the assembly.

 

Timberframe 72 Timberframe 79 Timberframe 81

Nightime raising seems to be our norm. Again we didn't make it to the actual raising during the daylight but everyone was game to put it up, so pizza was ordered and we set to work.

 

Timberframe 83 Timberframe 84

Here is the class photo in the dark once again. Too bad we couldn't peg these joints and get some of these straps out of the way. It's actually quite a nice structure.

 

Timberframe 85 Timberframe 88 Timberframe 89

Some photos from the next day of the whole building....

 

Timberframe 91 Timberframe 92

And a parting shot of me and my acorn.

I hope to combine my new timber frame skills with my logging and build a nice workshop for my metalworking and woodworking hobbies in the near future.

Questions about, or problems with this site?

Contact the Webmaster